Skip to main content
ADEX.OFFICES
Completed office renovation Singapore workspace by ADEX Offices

Office renovation SingaporeBare unit in.
Working office out.

One-stop commercial renovation for Singapore tenants — every trade under one programme, so your floor opens as a productive workspace, not an unfinished site.

Typical on-site programme
4–10 wks
Per sq ft planning range
SGD 80–180+
Under one contract
11 trades
CBD, business parks, SME floors
Islandwide

The short answer

What office renovation in Singapore actually means

Office renovation in Singapore is not a paint job with desks at the end. It is a commercial project: landlord rules, building services, acoustic privacy, furniture that matches power and data, and a handover date that survives endorsement delays.

ADEX Offices delivers turnkey fit-outs for bare units and deep refreshes of existing floors. You deal with us; we settle painting, electrical, aircon, partitions, acoustic glass, furniture, CCTV, digital locks, and related works. See how that compares with hiring trades separately in our office renovation contractor checklist.

Based at 5008 Ang Mo Kio Avenue 5, #04-09, Singapore 569874. We work islandwide — from CBD towers to business parks and small SME floors.

Three kinds of project

Which office renovation are you planning?

  • Bare commercial office unit in Singapore ready for fit-out

    Bare unit fit-out

    Empty shell in, working office out. We build power, data, aircon distribution, ceilings, partitions, finishes, and furniture as one programme.

    • Layout & landlord submission
    • MEP from scratch
    • Move-in-ready handover
    Bare unit guide
  • Existing fitted office in Singapore being reconfigured

    Existing office renovation

    Refresh, reconfigure, or strip and rebuild a fitted floor. The survey decides what to keep, adapt, or remove before anything is priced.

    • Keep / adapt / remove survey
    • Phased works if you stay
    • New rooms without waste
    Existing office guide
  • Office unit stripped back to bare condition for lease reinstatement in Singapore

    Reinstatement at lease end

    When the lease ends, the same team strips the fit-out back to the condition your lease requires, so you exit without hunting another contractor.

    • Lease clause review
    • Strip-out & making good
    • Landlord handback
    Reinstatement service

One contract

Every trade in the programme

Open any service for before / after detail, or send one brief covering all of them.

All services
  1. 01Renovation
  2. 02Partitions
  3. 03Electrical
  4. 04Aircon
  5. 05Toilet Tiling
  6. 06Painting
  7. 07Acoustic Glass Panels
  8. 08Furniture
  9. 09CCTV
  10. 10Digital Lock
  11. 11Reinstatement (Move-out)

Budget

How much office renovation costs in Singapore

Planning ranges per sq ft of NLA for a bare unit, not a quote. Glass specification, MEP load, furniture, and after-hours works move the number most.

Break it down further with the office fit-out cost guide and how to compare quotations.

Office renovation cost per sq ft in Singapore by fit-out tier
TierPer sq ft
Basic functionalPaint, basic partitions, lighting, power points, simple furniture package.SGD 80–120
Standard corporateAcoustic glass suites, better lighting, aircon works, workstations, meeting rooms, CCTV, digital locks.SGD 120–180
Premium / design-ledHigher-spec glass, joinery, feature lighting, custom furniture, tighter programme.SGD 180+

Timeline

How long office renovation takes, step by step

A typical SME floor, from first brief to keys. Stricter towers and bigger glass packages stretch it — the fit-out timeline guide and landlord approval guide show where.

  1. 01Weeks 0–2

    Brief & survey

    NLA, headcount, bare vs fitted, meeting mix, budget band, and move-in date — then a site survey that checks services and access rules.

  2. 02Weeks 2–7

    Design & landlord path

    Lock layout, glass, finishes, and furniture counts. Submit for building endorsement early so approval time sits inside the programme.

  3. 03Weeks 6–12

    Build as one programme

    Strip-out or shell works → MEP → partitions → finishes → furniture → security, under one accountable timeline.

  4. 04Final week

    Handover & snag close

    Desks powered, rooms usable, locks live. Defects liability with a clear owner — not a trail of vendors.

Proof on the floor

Before and after, same unit

View projects

Bare unit fit-out/Central Business District

CBD bare unit to open-plan office

Full turnkey fit-out of an empty Grade A floor — acoustic glass meeting rooms, workstation planning, MEP, and furniture under one programme.

Bare CBD office unit before renovation
Before
Completed CBD open-plan office after ADEX fit-out
After

SME office renovation/Business park, Singapore

Business park SME workspace

Compact SME floor rebuilt for hybrid headcount — quiet rooms, pantry, and clear collaboration zones without wasting NLA.

Business park office before renovation
Before
Renovated SME office with collaboration zones
After

FAQ

Office renovation Singapore, answered

Still unsure? Call +65 9099 0136 or send a brief.

How much does office renovation cost in Singapore per sq ft?

As a planning range, essential SME fit-outs land around SGD 80–120 per sq ft, mid-spec floors with acoustic glass suites, aircon works, and workstations around SGD 120–180 per sq ft, and premium joinery, feature lighting, or tight programmes above SGD 180 per sq ft. Glass, MEP load, furniture, and after-hours works move the number most.

How long does an office renovation take in Singapore?

Plan roughly 2–5 weeks for brief, survey, and design, 2–4 weeks for landlord or building endorsement once a complete pack is submitted, then about 4–10 weeks on site for a typical SME floor. Larger glass packages, aircon changes, and strict tower rules extend the on-site clock.

Do I need landlord approval before renovating my office?

Almost always. Most commercial buildings require endorsement of layout, M&E, and sometimes fire and ceiling drawings before noisy or structural works start. We flag endorsement items during scoping so approval time sits inside the programme instead of delaying it.

What is the difference between bare unit and existing office renovation?

A bare unit fit-out builds everything from an empty shell: power, data, aircon distribution, ceilings, partitions, finishes, and furniture. An existing office renovation works with what is already there — a cosmetic refresh, a reconfiguration, or a strip-and-rebuild — so the survey focuses on what to keep, adapt, or remove.

Can we keep working while the office is renovated?

Often, yes, by phasing zones and scheduling noisy works after hours or on weekends where the building requires it. Phasing adds coordination and can lengthen the programme, so it is agreed up front rather than improvised on site.

Do you handle reinstatement when the lease ends?

Yes. Reinstatement is part of the same service: we strip partitions, finishes, and fixtures back to the condition your lease requires so you can hand the unit back without hiring a separate contractor.

What happens at handover?

Before handover we walk the floor with you to confirm power, rooms, locks, CCTV, and aircon, then close the snag list. Defects liability sits with one accountable owner rather than a trail of separate vendors.

What do you need from me to quote an office renovation?

Your unit address or floor plan, approximate NLA, target headcount, bare or fitted condition, and move-in date. Photos and any landlord fit-out guidelines help. We return a practical scope and a budget range before drawings are locked.

Project brief

Tell us what you need.

Services, where you are, timeline, and address — enough for us to scope your Singapore office renovation and shape the rest.