Bare unit fit-out/Central Business District
CBD bare unit to open-plan office
Full turnkey fit-out of an empty Grade A floor — acoustic glass meeting rooms, workstation planning, MEP, and furniture under one programme.



One-stop commercial renovation for Singapore tenants — every trade under one programme, so your floor opens as a productive workspace, not an unfinished site.
The short answer
Office renovation in Singapore is not a paint job with desks at the end. It is a commercial project: landlord rules, building services, acoustic privacy, furniture that matches power and data, and a handover date that survives endorsement delays.
ADEX Offices delivers turnkey fit-outs for bare units and deep refreshes of existing floors. You deal with us; we settle painting, electrical, aircon, partitions, acoustic glass, furniture, CCTV, digital locks, and related works. See how that compares with hiring trades separately in our office renovation contractor checklist.
Based at 5008 Ang Mo Kio Avenue 5, #04-09, Singapore 569874. We work islandwide — from CBD towers to business parks and small SME floors.
Three kinds of project

Empty shell in, working office out. We build power, data, aircon distribution, ceilings, partitions, finishes, and furniture as one programme.

Refresh, reconfigure, or strip and rebuild a fitted floor. The survey decides what to keep, adapt, or remove before anything is priced.

When the lease ends, the same team strips the fit-out back to the condition your lease requires, so you exit without hunting another contractor.
One contract
Open any service for before / after detail, or send one brief covering all of them.
Budget
Planning ranges per sq ft of NLA for a bare unit, not a quote. Glass specification, MEP load, furniture, and after-hours works move the number most.
Break it down further with the office fit-out cost guide and how to compare quotations.
| Tier | Per sq ft | Typically includes |
|---|---|---|
| Basic functionalPaint, basic partitions, lighting, power points, simple furniture package. | SGD 80–120 | Paint, basic partitions, lighting, power points, simple furniture package. |
| Standard corporateAcoustic glass suites, better lighting, aircon works, workstations, meeting rooms, CCTV, digital locks. | SGD 120–180 | Acoustic glass suites, better lighting, aircon works, workstations, meeting rooms, CCTV, digital locks. |
| Premium / design-ledHigher-spec glass, joinery, feature lighting, custom furniture, tighter programme. | SGD 180+ | Higher-spec glass, joinery, feature lighting, custom furniture, tighter programme. |
Timeline
A typical SME floor, from first brief to keys. Stricter towers and bigger glass packages stretch it — the fit-out timeline guide and landlord approval guide show where.
01Weeks 0–2
NLA, headcount, bare vs fitted, meeting mix, budget band, and move-in date — then a site survey that checks services and access rules.
02Weeks 2–7
Lock layout, glass, finishes, and furniture counts. Submit for building endorsement early so approval time sits inside the programme.
03Weeks 6–12
Strip-out or shell works → MEP → partitions → finishes → furniture → security, under one accountable timeline.
04Final week
Desks powered, rooms usable, locks live. Defects liability with a clear owner — not a trail of vendors.
Proof on the floor
Bare unit fit-out/Central Business District
Full turnkey fit-out of an empty Grade A floor — acoustic glass meeting rooms, workstation planning, MEP, and furniture under one programme.


SME office renovation/Business park, Singapore
Compact SME floor rebuilt for hybrid headcount — quiet rooms, pantry, and clear collaboration zones without wasting NLA.


Plan it properly

Project planning/10 min read

Cost guides/9 min read

Project planning/9 min read

Project planning/9 min read

Cost guides/9 min read

Fit-out guides/9 min read
As a planning range, essential SME fit-outs land around SGD 80–120 per sq ft, mid-spec floors with acoustic glass suites, aircon works, and workstations around SGD 120–180 per sq ft, and premium joinery, feature lighting, or tight programmes above SGD 180 per sq ft. Glass, MEP load, furniture, and after-hours works move the number most.
Plan roughly 2–5 weeks for brief, survey, and design, 2–4 weeks for landlord or building endorsement once a complete pack is submitted, then about 4–10 weeks on site for a typical SME floor. Larger glass packages, aircon changes, and strict tower rules extend the on-site clock.
Almost always. Most commercial buildings require endorsement of layout, M&E, and sometimes fire and ceiling drawings before noisy or structural works start. We flag endorsement items during scoping so approval time sits inside the programme instead of delaying it.
A bare unit fit-out builds everything from an empty shell: power, data, aircon distribution, ceilings, partitions, finishes, and furniture. An existing office renovation works with what is already there — a cosmetic refresh, a reconfiguration, or a strip-and-rebuild — so the survey focuses on what to keep, adapt, or remove.
Often, yes, by phasing zones and scheduling noisy works after hours or on weekends where the building requires it. Phasing adds coordination and can lengthen the programme, so it is agreed up front rather than improvised on site.
Yes. Reinstatement is part of the same service: we strip partitions, finishes, and fixtures back to the condition your lease requires so you can hand the unit back without hiring a separate contractor.
Before handover we walk the floor with you to confirm power, rooms, locks, CCTV, and aircon, then close the snag list. Defects liability sits with one accountable owner rather than a trail of separate vendors.
Your unit address or floor plan, approximate NLA, target headcount, bare or fitted condition, and move-in date. Photos and any landlord fit-out guidelines help. We return a practical scope and a budget range before drawings are locked.
Project brief
Services, where you are, timeline, and address — enough for us to scope your Singapore office renovation and shape the rest.